Friday, December 14, 2007
Kitchen Saga
Well, we've taken a break from working on the kitchen so that we can focus on Christmas, but we have come a long way since our last posting. We have ripped out almost all the cabinets and put in the new sink. We installed the floor in the kitchen and then decided a month later the floor was not level enough, so we pulled it all up, got someone to come in and level the floor and then put the floor all back in. It's not perfect, but it's close enough and things are really starting to come together. We have all the bottom cabinets in place and functional, but have to wait for an electrition before we officially install them, so we're still a few months off, but it's close and we can function fairly normally now. Aah!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment